Thanks to new sponsors Rubicon People we’ve made huge progress in the engineering zone.
Work done so far:
- Area cleared
- Floor leveled
- Safety flooring fitted
- Workbenches installed
- Bench drill
- Laser cutter
- Soldering station
There’s still some work to do in this section but we can already do some activity and the tools are already helping us with the planetarium construction (sponsored by VOIP Unlimited).